Wednesday, June 8, 2011

Trellis is complete.

"I love it when a plan comes together" John (Hannibal) Smith, A-Team.
One full fruit zone on petit manseng. Cluster thinning is required.

The last wire installation was needed immediately.
With the last of the hardward installed, I can focus completely on vine health. PM is a bit ahead of PV as far as grape maturity. I couldn't be happier overall. The fugus control is adequate. The vines look great. Tendrils indicate good hydration, despite lack of rain. A happy vineyard.

No comments:

Post a Comment